PENENTUAN JADWAL PEMESANAN MATERIAL PEMBENTUK KOMPONEN PESAWAT TERBANG UNTUK MEMINIMASI TOTAL BIAYA INVENTORY

Authors

  • Rd Adriyani Oktora
  • Kencana Verawati

Abstract

PT Goodrich Pindad Aeronautical Systems Indonesia is one of the manufacturing companies engaged in the assembly and sale of aircraft components. The company often experiences sudden material purchases, which will incur substantial costs because the shipment must be made by airfreight. The results of this study can be seen that the products included in category A amounted to 8 products that have a total value of 23.7% -79%. Total cost and PoR for independent demand product is Flanged Hub Short 800-0101/AC ($5,540 & 2,209 EA), Flanged Hub Long 800-1101/B ($4,972 & 1,610 EA), Flanged Hub Short 799-0101/AB ($4,864 & 1,610 EA), Flanged Hub Long 799-1001/B ($4,864 & 1,610 EA), Act Cap Rod End D59481/2 ($5,864 & 2,327 EA). Total cost dan PoR untuk produk dependent demand Casing Body Assy CH1540P0008/5 yaitu CH1540-0135/5 ($48,061.68 & 470 EA), PLGA1561010 ($1,554.75 & 1,538 EA), PLGA1871010 ($14,996.4 & 4,766 EA), PLGA3431010 ($ 9,399.37 & 1,670 EA), PLGA4061010 ($14,813.3 & 1,308 EA), SR258L0036 ($18,078.2 & 3,924 EA), SR162L ($6,897.39 & 1,976 EA), JETA1872220D ($51,648.1 & 454 EA), PLGA2501010 ($2,962.405 & 1,056 EA), A88340/4 ($42,378.1 & 251 EA).

Downloads

Published

2017-11-14